Search for "epoxy floor cost UK" and you'll find per-square-metre figures all over the place. Some are years out of date, some are for a thin coat of floor paint, and some are for industrial systems laid across thousands of square metres. None of them tell you what your floor will cost.

We don't publish a price list for the same reason. Two floors of the same size can need completely different amounts of work. What we can do is explain exactly what drives the price, so you understand any quote you're given, ours included, and can spot when something's missing.

The short version

Six things decide the cost of a resin floor:

  1. Area: how many square metres, and how awkward the shape is.
  2. Substrate condition: what's there now and how much preparation it needs.
  3. Moisture: whether the slab or screed is dry enough, or needs extra protection.
  4. System: metallic, flake or quartz, and the thickness of the build.
  5. Topcoat and finish: UV stability, wear resistance, anti-slip, gloss or matt.
  6. Design and logistics: how complex the pour is, access, furniture, scheduling.

The rest of this guide takes each one in turn.

1. Area, and why small floors cost more per m²

Area is the obvious one: more floor, more material, more time. But price doesn't scale in a straight line. A lot of the cost of any resin job is fixed: surveying, travel, setting up grinding and extraction kit, protecting the room, mixing stations, cleaning down. That's roughly the same whether the floor is 8 m² or 40 m².

So a small bathroom or hallway will almost always cost more per square metre than a double garage. If you're thinking about more than one area, doing them in one visit usually makes better use of that fixed cost.

Shape matters too. A plain rectangular garage is quick to grind and pour. A kitchen with an island, plinths, a dozen corners and three doorways takes longer to edge, mask and finish well.

2. The substrate: what you're pouring onto

This is the factor people underestimate most, and it's where cheap quotes usually cut corners. Resin is only as good as its bond. The surface has to be sound, clean and open so the primer can soak in.

What's there nowTypical prepEffect on cost
Clean, sound concrete slabDiamond grind, vacuum, minor repairsLowest prep
Concrete with old paint or sealerGrind back through the coating to sound concreteMore grinding time and tooling
Cracked or pitted concreteCrack chasing, resin repair mortar, grind flushDepends on extent
Sound, well-bonded tilesAbrade, fill grout lines, levelSaves tile removal; adds levelling
Loose or hollow tilesRemove tiles and adhesive, repair screedSignificant extra work
Uneven or out-of-level floorLevelling compound or screed repairsMaterial and drying time
Oil-contaminated garage slabDegrease, grind, possibly specialist primerExtra prep stages

Our Champagne Pearl conservatory is a good example. It had a tiled floor that was sound enough to keep, so instead of ripping it out, the tiles were prepared and levelled and the resin went over the top. That's a sensible saving, but only when the tiles are genuinely well bonded.

Tiled conservatory floor before resin, with bags of levelling compound stacked in the corner
Sound tiles can often stay. Preparing and levelling them is cheaper and quieter than removal.

3. Moisture

Moisture rising through a slab is the single most common cause of resin floor failure: bubbles, blisters and coatings that lift. Older houses without a working damp-proof membrane, ground-floor extensions and new screeds that haven't dried are all risks.

A proper installer tests before quoting. If readings are high, the options are to wait (new screeds can need weeks or months), use a moisture-tolerant primer, or install a damp-proof membrane system under the floor. Each adds cost, but far less than redoing a failed floor.

4. The system and its thickness

"Epoxy floor" covers a huge range of products, from a single roll-on coat to multi-layer systems several millimetres thick.

  • Floor paint or thin roller coat: a fraction of a millimetre. Cheapest, shortest life, prone to hot tyre pickup in garages.
  • Flake system: primer, pigmented base, broadcast flake, scrape, clear topcoat. Practical and forgiving.
  • Metallic system: primer, a self-levelling metallic body coat typically 2–3 mm, hand-worked design, clear topcoat. More material and much more skilled labour.
  • Quartz system: dense coloured aggregate in clear resin. Heavy-duty and slip-resistant, more material-intensive.

Thickness drives material cost directly. It also drives lifespan. A floor that's been thinned out to hit a price has less to wear through.

5. Topcoat and finish

The topcoat is the layer you walk on. Its job is to resist scratches, chemicals and UV and to give the finish you want. Options that affect price include:

  • UV-stable polyurethane or polyaspartic topcoats. These are strongly recommended for sunny rooms and pale colours, because standard epoxy can yellow over time in sunlight.
  • Anti-slip aggregate for kitchens, bathrooms, wet rooms, entrances and commercial floors.
  • Gloss, satin or matt finishes.
  • Additional coats for high-traffic or commercial use.

6. Design complexity and logistics

A single-colour flake floor is a methodical job. A three-colour metallic with tight gold veining across an open-plan room is choreography: multiple mixes, careful timing and a team working the pour before it gels. More colours, more effects and bigger continuous areas mean more people and more skill on the day.

Logistics count too: access for equipment, parking, how much furniture has to be moved or protected, whether a business needs evening or weekend work, and whether the space needs heating in winter so the resin cures properly.

How to compare quotes like for like

Prices can only be compared when the scope is the same. Ask every installer to put the following in writing:

  1. The preparation method. Diamond grinding with extraction, or something lighter?
  2. Whether moisture has been tested, and what happens if readings are high.
  3. Every layer of the system: primer, body coat (and its thickness), broadcast if any, topcoat.
  4. The topcoat type, and whether it's UV-stable.
  5. Crack and joint repairs: included, or extra?
  6. Anti-slip: included where needed?
  7. Furniture moving, protection and clean-up.
  8. Timings: days on site, and when you can walk, furnish and drive.
  9. Whether the price is fixed after survey, or an estimate that might change.
The cheapest resin floor is the one you only pay for once.

How we price

Every Epoxy Drip floor starts with a survey. We measure, test and look at the substrate, talk about how the space will be used and what you want it to look like, then give you a fixed written quote with the full system written out. If you want to explore colours first, try the Colour Lab and send us your design along with your quote request.

Keep reading

Ready when you are

Let's pour something nobody else has.

Tell us about the space: room, rough size, the look you're after. We'll come back with ideas, a survey date and a fixed written quote.

WhatsAppCallGet a quote